KCE Logo
Image Placeholder

Electric Power Connection 2 X 25 MVA PT Krakatau Nippon Steel Synergy

2015

Share:

Share on FacebookConnect on LinkedIn

KCE successfully completed the development of a 2x25 MVA power connection for the PT Krakatau Nippon Steel Synergy plant in 2015. The project included the development and installation of electrical infrastructure to ensure a stable and sustainable power supply for the facility’s operations.